Malaysia
| Participants | |
|---|---|
| Owner | Acquedotto Pugliese Spa |
| Contractor | Ban Hin Electrical & Construction Sdn Bhd |
| Location of the Job Site | Kuala Lumpur, Malaysia |
| Tender | |
| Short Description of Job | Laying of gravity sewers ID 300 mm in Cheras/ KL for the Langat CSTP, Zone 4A & 4B |
| Specifications for Tenders | Sewerage System for Zone 4A & 4B Langat Centralised Sewage Treatment Plant and Sewerage Piping Network. Works included in this contract comprises, 13,000m of pipe (by micro-tunnelling & jacking method), 166 nos. of pits (design & build), manholes and other associates works. |
| Alternative Methods proposed by the Constructor | Guided auger boring instead of slurry microtunneling |
| Ground conditions | |
| Described Ground in the Ground Report | Back filled soil with pieces of concrete, broken rock (up to 30Mpa), roots and building waste |
| Depth of Coverage | up to 8 m |
| Accuracy | ± 20 mm, given slope 0,03 % |
| Time for Job or Production Rate | The project is scheduled to complete in October 2020 |
| Driving Length | up to 80 m |